Coarse
Time
Information
Capital
Tools & Machines
Energy
Materials
People
Exploring ideas
Capital
Information Age
Assembly line
Closed Loop
You are limited or restricted to a certain amount.
There is a criteria or constraint you have to meet.
Coping saw
Materials
Leadership
Agricultural Revolution
Industrial Revolution
Information Age
Plan & Develop
Input, Process, Output, Feedback
Define the problem
Explore ideas
Plan & Develop
Test, Evaluate, Modify
Present the solution
Define the problem
The scroll saw is used to cut out intricate designs like shapes and curves.
Industrial Revolution
Agriculture & Biotechnology
Construction
Energy
Information & Communication
Manufacturing
Medical
Transportation
The chuck key
Feedback
Positively
Negatively
Quality Control
1/8"-1/4"
A group of parts working together
Name the first step in the design process.
Name the job title responisble for giving feedback that helps to make a more uniform product while manufacturing on an assembly line?
Name the ages of technology in chronological order.
Name the steps in a closed loop system in order.
Name this tool
During the industrial revolution which process made the production of products quicker and easier to build?
Name the type of systems model a thermostat is an example of.
Please give the definition of a system
Technology can both ________ and _________ impact society.
At what height should the band saw guard be from your work before using it to cut?
What is the name alternate name of the resource that is also called Money
What are the 7 resources that you manage within a project?
Which step in a closed loop system automatically adjusts the system?
Name the 7 systems of Technology (In alphabetical order)
What is the name of the tool used to loosen or tighten the chuck on the drill press?
Jake is constantly taking balsa wood from the teacher and chopping it into little bits and throwing it across the room. Which of the 7 resources is he directly wasting.
Is 100 grit sand paper considered to be coarse or fine?
What is the importance of managing your resources wisely during a project
Which step in the design process would require you to complete a technical drawing of your product
List the 5 steps of the design process in order
What is the scroll saw used for?
Which age of technology focused on moving into the city and producing products in a factory?
Name the age of Technology we live in
Brainstorming is completed during which step in the design process
If Mason is working within a group of students and he is spending a lot of time on his cell phone what character trait is he not displaying
Description | Match: |
Which age of technology focused on moving into the city and producing products in a factory?
| Industrial Revolution |
Name the age of Technology we live in | Information Age |
During the industrial revolution which process made the production of products quicker and easier to build? | Assembly line |
Technology can both ________ and _________ impact society. | Positively Negatively |
Name the ages of technology in chronological order. | Agricultural Revolution Industrial Revolution Information Age |
Name the steps in a closed loop system in order. | Input, Process, Output, Feedback |
Please give the definition of a system | A group of parts working together |
Which step in a closed loop system automatically adjusts the system?
| Feedback |
Name the type of systems model a thermostat is an example of. | Closed Loop |
Name the 7 systems of Technology (In alphabetical order) |
Agriculture & Biotechnology Construction Energy Information & Communication Manufacturing Medical Transportation
|
Name the first step in the design process. | Define the problem |
Brainstorming is completed during which step in the design process | Exploring ideas |
What is the name alternate name of the resource that is also called Money | Capital |
Which step in the design process would require you to complete a technical drawing of your product | Plan & Develop |
List the 5 steps of the design process in order | Define the problem Explore ideas Plan & Develop Test, Evaluate, Modify Present the solution |
What are the 7 resources that you manage within a project? | Time Information Capital Tools & Machines Energy Materials People |
Jake is constantly taking balsa wood from the teacher and chopping it into little bits and throwing it across the room. Which of the 7 resources is he directly wasting. | Materials |
What is the importance of managing your resources wisely during a project | You are limited or restricted to a certain amount. There is a criteria or constraint you have to meet. |
If Mason is working within a group of students and he is spending a lot of time on his cell phone what character trait is he not displaying | Leadership |
Name the job title responisble for giving feedback that helps to make a more uniform product while manufacturing on an assembly line? | Quality Control |
Is 100 grit sand paper considered to be coarse or fine? | Coarse |
At what height should the band saw guard be from your work before using it to cut? | 1/8"-1/4" |
What is the scroll saw used for? | The scroll saw is used to cut out intricate designs like shapes and curves. |
Name this tool | Coping saw |
What is the name of the tool used to loosen or tighten the chuck on the drill press? | The chuck key |